PALEONTOLOG: nastastie mi to vie grox zosumarizovat, tak nemusim stravit pol dna overovanim nejakeho vykriku, takze cca rok uz k tomu nie je ziadne novsie stanovisko nez nejaky novy navrh, takze nevieme urcite ci ten stav trva alebo doslo k naprave alebo sa to klasicky po nemecky zamietlo pod koberec
Synthesizing this:
December 2024 Contract Draft: Reduces Tesla’s water use to 1.4 million cubic meters, permits higher wastewater pollutants, awaiting Tesla’s approval. A pragmatic resolution to the February 2024 standoff, but controversial.
Legal Action: Tesla’s March 2024 lawsuits against WSE signal distrust, potentially pressuring the December deal, though outcomes are pending.
Local Reaction: Protests and transparency demands persist, with no public contract disclosure, fueling skepticism.
Regulatory Silence: Beyond groundwater praise, no new LfU directives on wastewater treatment post-February 2024, leaving the draft as the main shift.