a k vasi diskusi o vodiku v australii:
---jeden z projektu(je jich nekolik v tyhle oblasti) - The Asian Renewable Energy Hub - 2028:
The proposed project includes:
26 GW of wind and solar generation
At least 3 GW of generation capacity for Pilbara energy users
Up to 23 GW of generation for production of green hydrogen and green ammonia
Up to 100 TWh of total annual generation
A design life of 50+ years
From a 14,000-square kilometre initial land package, 6,500 square kilometres of land in the East Pilbara region of Western Australia were selected to accommodate 26,000 MW of wind turbines and solar photovoltaic panels. Outstanding wind and solar resource and large project scale will result in competitively priced renewable energy with a high capacity factor.
---dalsi projekt (The Arrowsmith Hydrogen Project) ten by mel byt v provozu koncem 2022
The plant would be supplied by around 85 megawatts of solar power, supplemented by 75 megawatts of wind generation capacity, which will be generated on-site. The project would also integrate a large-scale battery on-site.
Green Hydrogen Sub-commercial Plant #1
Stage One of the IBE Liquid Hydrogen Project will be the Arrowsmith Project, located in Western Australia. This installation will commence production in 2022
resulting in 25 tons (25,000 kg) of green Hydrogen per day from the zero carbon energy sources of water, solar and wind.
Green Hydrogen Commercial Plant #2
(Capacity 75,000Kg/day)
obrazek patri k AREH