• úvod
  • témata
  • události
  • tržiště
  • diskuze
  • nástěnka
  • přihlásit
    registrace
    ztracené heslo?
    TUHOKlimaticka zmena / If the fracturing of our once stable climate doesn’t terrify you, then you don’t fully understand it
    SHEFIK
    SHEFIK --- ---
    JIMIQ: kdybych chtel rejpat, zeptal bych se, jestli tezba bitcoinu nepotrebuje taky infrastrukturu. taky bych se moh zeptat na srovnani pridane hodnoty jednotlivych reseni z pohledu lidstva/klimatu/jednotlivce

    ale rejpat nebudu :)
    JIMIQ
    JIMIQ --- ---
    SHEFIK: z toho není tak rychlej zisk bez další infrastruktury :)
    SHEFIK
    SHEFIK --- ---
    JIMIQ: v hlavni roli bitcoin "vysvoboditel" :))

    selsky rozum mi rika, ze kdyz je mozny z odpadniho plynu tezit bitcoin, je taky mozny tu energii treba konvertovat na vodik atd.
    JIMIQ
    JIMIQ --- ---
    Bitcoin jako požírač energie. Ale co když je to naopak? - Seznam Zprávy
    https://www.seznamzpravy.cz/clanek/bitcoin-jako-pozirac-energie-ale-co-kdyz-je-to-naopak-145138

    Odpadní plyn jako vedlejší produkt těžby ropy je uvázlá, nepoužitelná energie, generující jen náklady a spaliny.

    Tedy byla to nepoužitelná energie, dokud firma Crusoe nezačala dodávat mobilní kontejnery obsahující turbínu, generátor a datové centrum. Tato sestava umí ukončit bezúčelné a neekologické pálení plynu a vysvobozenou energií zásobovat těžbu bitcoinů, financující celou hru. Marty Bent z firmy GAM odhaduje, že jedna instalace za jeden měsíc spotřebuje a zaplatí plyn asi za $475k. Plyn, který by jinak přišel nazmar. Ročně se na světě bez užitku spálí asi 150 miliard m3 plynu, což by Česku stačilo skoro na 20 let.

    Těžba bitcoinů nabízí cestu, jak monetizovat nepřenositelnou energii, ať je, kde je. Nic takového dosud nebylo možné a profit je skvělá motivace.
    SEJDA
    SEJDA --- ---
    TADEAS: no jo, tedka radova chybka ;)
    TADEAS
    TADEAS --- ---
    SEJDA: sice nejsme v klubu poctaru, ale 50 ha je pul km ctverecniho, tj. kilak x 500 m... to co uvadis je desetina.
    SEJDA
    SEJDA --- ---
    RADIQAL: 50ha = je 220x220m.
    No taky to tam uz nevidim, bylo to tam dole v pravo ;) Takze jsem bud halucinoval, nebo to upravili.
    RADIQAL
    RADIQAL --- ---
    RADIQAL: 50 ha = cca 70 fotbalovych hrist.
    RADIQAL
    RADIQAL --- ---
    SEJDA: sry ale taky jsem z toho linku nikde nevycet, ze prave na tomhle obrazku by melo byt 50ha. co presne jsi tim chtel ilustrovat?
    PER2
    PER2 --- ---
    a k vasi diskusi o vodiku v australii:

    ---jeden z projektu(je jich nekolik v tyhle oblasti) - The Asian Renewable Energy Hub - 2028:
    The proposed project includes:
    26 GW of wind and solar generation
    At least 3 GW of generation capacity for Pilbara energy users
    Up to 23 GW of generation for production of green hydrogen and green ammonia
    Up to 100 TWh of total annual generation
    A design life of 50+ years

    From a 14,000-square kilometre initial land package, 6,500 square kilometres of land in the East Pilbara region of Western Australia were selected to accommodate 26,000 MW of wind turbines and solar photovoltaic panels. Outstanding wind and solar resource and large project scale will result in competitively priced renewable energy with a high capacity factor.


    ---dalsi projekt (The Arrowsmith Hydrogen Project) ten by mel byt v provozu koncem 2022
    The plant would be supplied by around 85 megawatts of solar power, supplemented by 75 megawatts of wind generation capacity, which will be generated on-site. The project would also integrate a large-scale battery on-site.

    Green Hydrogen Sub-commercial Plant #1
    Stage One of the IBE Liquid Hydrogen Project will be the Arrowsmith Project, located in Western Australia. This installation will commence production in 2022 resulting in 25 tons (25,000 kg) of green Hydrogen per day from the zero carbon energy sources of water, solar and wind.

    Green Hydrogen Commercial Plant #2
    (Capacity 75,000Kg/day)



    obrazek patri k AREH

    PER2
    PER2 --- ---
    SEJDA: "Kdyby se vam zle predstavovalo, co je to 50ha, tak je to asi tolik"

    uhm, tohle ze je 700x700m?

    v clanku:
    "Floating solar installations at the dam, which will resemble those in this image"
    "“The [floating PV] project will occupy a total area of about 50 hectares of water surface and will require over 127,000 PV panels "
    SEJDA
    SEJDA --- ---
    DZODZO: no prece, ze elektrolyzovat muzou i arabove, takze proc by to melo byt vsechno v australii? :)
    DZODZO
    DZODZO --- ---
    SEJDA: takze pri zapocitani vsetkych tych naddimenzovani mi to vychadza 1km2 plochy na 1 lod, takze budes potrebovat flicek velkosti 55000km2, ale stale neviem ci je to teda jako malo alebo jako moc, neviem co tym sledujes
    THEODORT
    THEODORT --- ---
    SEJDA: kurva elegantni reseni jak udrzet v rezervoaru pitnou vodu
    SEJDA
    SEJDA --- ---
    Kdyby se vam zle predstavovalo, co je to 50ha, tak je to asi tolik:

    Tender for 50 MW of floating solar launched in Portugal – pv magazine International
    https://www.pv-magazine.com/2019/11/27/tender-for-50-mw-of-floating-solar-launched-in-portugal/
    SEJDA
    SEJDA --- ---
    DZODZO: vzdyt uz jsem ti to spocital: SHEFIK odhaduje 200 GWh energie na vyrobu C-H2 (asi elektrolyza vody), to je pri 2MWh z kazdeho m2 za rok, jenom 10 ha solarnich panelu, tedy pokud ti bude stacit tu lod nabit jednou za rok. Pokud se otoci 3x, tak potrebujes 30 ha, no s nejakyma mezerama atp. 50 ha. 573 km2 je pri 50 % vyuziti plochy neco jako 573 TWh, tj. jako 3000 tech lodi?
    Delam nekde radovou chybu, anebo jenom ty nevis, ze se do 1 km2 vejde 100 hektaru?
    DZODZO
    DZODZO --- ---
    SEJDA: ok tu som ti to zakreslil hned pre vsetky obchodne lode sveta, inymi slovami stale nechapem tu narazku na to "tak si to vypocitaj", ze co tym sledujes, ze ci je to jako hodne alebo jako malo

    SEJDA
    SEJDA --- ---
    DZODZO: otazka ale nebyla kolik potrebuje cely svet, ale kolik potrebuje jedna lod.
    DZODZO
    DZODZO --- ---
    mozno ta minula ta diskusia z vedlajsieho klubu, ale to nie je podstatne, tuto to mas obrazkom tu celkovu spotrebu sveta pokrytu plochou australie, tak si z toho vyrez nejaky ctverecek na ty lode a uvidis kolko nehostinnej puste musia australania obetovat aby mohli vyvazat vodik

    SEJDA
    SEJDA --- ---
    DZODZO: pri pocitani 2000 kWh/m2.rok to dava min. 10 ha. At ted si to prepocitej na co chces, ale asi ji si spletl klub, toto nejsou vedecke vtipy.
    Kliknutím sem můžete změnit nastavení reklam